1. Total area of the project is 322,3 ha :
- 64,24 ha of Industrial Land areas.
- 191,45 ha of Non-Tariff Zone areas.
2. Minimum rental area: 10,000m2
3. The permitted maximum building density in industrial land lots is 70% and conforms to Vietnam construction standards 01:2008/BXD